Correction

In the February 24 issue of Suburban News and Hamlin-Clarkson Herald, the number of total square feet of the proposed Ogden highway facility was incorrect. The article stated that the entire facility would be 7,100 square feet. The facility will actually be 55,100 square feet, which includes office space, a maintenance area and a storage area with an indoor wash bay. In addition (not included in that 55,100 square feet) there will be 12,000 square feet of covered, outdoor parking area (roofed over, not enclosed or heated).

We regret the error and any confusion it may have caused.